HIGHGATE – It’s official. Highgate Sports Arena has a new look.
Construction on the old building finished this month to give Highgate’s premier recreation location a facelift in the form of a new entrance and new roof.
“If you play hockey or not, in the summer, in the winter, just a ton of people are in and out of here,” Highgate town administrator Fredi Hayes said. “Its just a great place for the community to be.”
The Town of Highgate and its recreation commission have spent the last few years putting together a plan to update the Highgate Sports Arena, as the building is starting to show its age. Phase 1 of that work was completed just this month.
The new construction includes the new roof, as well as an updated vestibule area that’s ADA-compliant, paired with a new front office to help recreation director Jes Bombard. She had been doing business out of an office space without any windows set up close to the Zamboni storage room.
“The sun has gotten me a couple of times. Like, woah!” she said from the updated lobby area. “It’s definitely nice being up here.”
It’s also a fair bit warmer. Recent visitors will likely notice the higher temperatures in the lobby thanks to the new vestibule.
To make the building more efficient, Highgate relied on municipal energy resilience planning grants that cover some construction costs, and the new vestibule and updated polyethylene roof help the building retain more heat during the winter. Over time, that should help the town recoup some cost savings, Hayes said, as its HVAC system won’t need to work as hard to keep the building warm.
As for Bombard’s new office, she said she’s already found some benefits to being situated in the front of the building where she can see who’s coming in and out. While hockey players usually know where to find her, Bombard said she’s already been able to quickly help out residents less familiar with the arena, thanks to her new office view.
To complete the work, construction costs for Phase 1 were roughly $975,000, with just over $410,000 being covered by the Municipal Energy Resilience Program grant received last year. The remaining funds were saved by the Town of Highgate for the arena as part of its capital improvement program, Hayes said.
“It’s a really good sign of community health that we didn’t have to take out a loan for this work, and that we have so many other opportunities for funding that are not (loans),” she said.
With Phase 1 in the rearview mirror, Hayes said the Town of Highgate and the recreation commission will now begin examining next steps, or Phase 2, in more detail. To help with the task, they plan on reinstating the Highgate Arena Renovation Team, or HART, to consider the building’s needs.
What Phase 2 entails, however, is still being worked out. A few needs on the shortlist include a new exterior, as well as an updated snack bar, HVAC system and new locker rooms.
Bombard said locker room space, especially, can be cramped when the arena is busy, with hockey equipment taking up a lot of room when teams are using the locker rooms. If they had more space and an expanded area for the teams, however, they could host expanded tournaments, to improve upon the program.
Highgate Arena already serves as home ice for Milton High School’s team, Missisquoi Valley Union boys and girls teams as well as the Milton Youth Hockey Association, Bombard said.
Changing the locker rooms would also help alleviate some of the regular lobby crunch.
When the building is really busy, teams coming in and out have to walk through the line of people waiting for food at the snack bar, Bombard said, creating a major crunch for everyone involved. An update to the locker rooms, or a potential expansion to the lobby, could help open up the area by directing teams in a different direction in order to access them.
“It gets crazy busy, and we want everybody to be comfortable and safe,” Bombard said.”Without doing a completely new arena, we’re trying to work with what we have a little bit at a time.”
Whatever it will be, most of the work is expected to be concentrated on the north side of the building as they consider what could be done to improve the arena’s services.
Outside of its hockey program, Bombard said the arena’s public skate program has been popular this season, with roughly 100 people attending every weekend. When the ice isn’t set up for the cold season, Highgate Arena acts as an event venue for local residents and nonprofits, as well as a stadium for indoor soccer and street hockey tournaments during the warmer months.
Comments
No comments on this item Please log in to comment by clicking here