RICHFORD – Despite barely being in the ground for two weeks, the new equipment at Richford’s recreation field and playground draws more than 100 kids every morning, said Linda Collins, Richford’s selectboard chair.
“I head by there every morning,” Collins said. “There’s at least a hundred kids there.”
Late last month, the final pieces of a new playground were added to both the playground and Davis Park, the crescendo of a several-year project spearheaded by Collins to replace decades-old equipment in Richford’s two main parks.
“A couple years ago, I was looking at the playground equipment and realized it was at least 40 years old,” said Collins, who led much of the project that saw new equipment installed in Richford’s parks. “I thought ‘Hey, kids here deserve something better than that.’”
Collins said she remembered bringing her own daughter down to the park several decades ago, adding that, much to the park’s detriment, a lot of that equipment hadn’t really changed.
It was impossible to find a part for the discontinued spinner, she explained. The slide had metal bolts sticking out of it. Later, when speaking with the Messenger, Collins characterized the old playground Richford replaced as barely being more than a swing set and a slide.
“The equipment there was the old metal stuff and hadn’t been updated,” Collins said. “A lot of us remember it 40 years ago.”
The project saw the addition of both more robust and safer equipment, with metal edges and bolts replaced by smoother, more ergonomic plastic equipment and in which a larger variety of jungle gyms and swing sets are scattered around a widened play area.
That morning, kids from the Northern Tier Center for Health (NOTCH) Summer Day Camp huddled beneath a Fischer-Price treehouse that, according to NOTCH camp counselor Maci Randall, was a popular hiding place for them.
Others scattered around a new spinner, perched atop a jungle gym reminiscent of a handful of jacks or climbed up a slide that wound into a new play area. The swings in particular were crowded by campers.
“I’ve been here five years and the kids never had so much fun,” Randall said.
The project was funded entirely by grants courtesy of the state, the Community Fund, a PROMISE grant and RiseVT. As each grant was awarded, Collins’s plan for the parks’ equipment grew.
“I kept getting grants,” Collins explained. “I figured it was meant to be.”
She also admitted that the new equipment ultimately meant the play areas in the parks also had to grow, as each new piece of equipment “was bigger than we thought they’d be.”
Richford’s road crews contributed much of the physical installation work, something Collins said she was grateful for. She also added that the community itself lent resources to the project, like the local landscaper who tore down a tree for the addition of equipment in Davis Park.
“This couldn’t happen in other places,” Collins said with a grin. “Where do you get someone to cut down a tree and carry it away in 24 hours?”
“It’s for the people of Richford…”
According to Collins, the new playgrounds are a part of a larger plan for recreational infrastructure in Richford.
An extension of the Missisquoi Valley Rail-Trail, the nearly 30-mile trail carving through most of Franklin County, is already planned to lead directly into Richford’s downtown.
Meanwhile a shed was built in the parking lot adjacent to Richford’s first NOTCH clinic, where, according to Collins, bike rentals managed by the nearby NOTCH thrift shop will be available for residents and tourists alike.
For the full story pick up a copy of today’s Messenger or subscribe to our digital edition.
Comments
No comments on this item Please log in to comment by clicking here